Wickenden Road Bathroom Renovation
Work Completed:
-Removed the existing bathroom and all original finishes
-Relocated sink rough-ins to improve layout and usability
-Completed drywall repairs and full repainting
-Installed a neo-angle shower kit
-Added Kerdi waterproofing and finished the shower with sage tile
-Upgraded to a Panasonic whisper-quiet ventilation fan
-Updated electrical fixtures
-Installed new base, vanity, mirror, and cabinetry
-Continued sage tile as a clean, integrated backsplash
-Installed a modern toilet
-Installed sandstone floor tile
-Added new wall fixtures
-Installed a solid core Lincoln Park door with upgraded handle